Henry Laurence Gantt (May 20, 1861 to November 23, 1919) was an American mechanical engineer and management consultant who worked in the development of scientific management. He created the Gantt chart in the 1910s. [1]
Gantt was born to a prosperous plantation family in Calvert County, Maryland, at the outbreak of the American Civil War. After the war, the family forfeited their land and slaves before relocating to Baltimore. [1]
He graduated from McDonogh School in 1878 and from Johns Hopkins University in 1880. He then returned to the McDonogh School to teach for three years. He subsequently received a master's degree in mechanical engineering from the Stevens Institute of Technology in New Jersey. [1]
In 1884, Gantt began working as a draughtsman at the iron foundry and machine-shop Poole & Hunt in Baltimore. In 1887 he joined Frederick W. Taylor, initially as an assistant. He began applying scientific management principles at Midvale Steel and Bethlehem Steel, working with Taylor until 1893. The two jointly received six patents. [1]
From 1902 to 1919 Gantt worked as a private consultant to industry on efficiency improvement. In 1911, Gantt, Frank Gilbreth and Carl Barth founded The Society to Promote the Science of Management, later known as the Taylor Society. The society sought to promote Taylor's methods and philosophy in industry. [1]
In 1916, influenced by Thorsten Veblen, Gantt set up the New Machine, an association which sought to apply the criteria of industrial efficiency to the political process. [1]
Chrome extension
Turn any webpage into a sticky note.
Stop losing tabs and copying links. One click saves the page, video or article you're looking at as a note on your wall. No typing, no forms, no copy-paste.
Add to Chrome, it's free →Gantt created many different types of charts. He designed his charts so that foremen or other supervisors could quickly know whether production was on schedule, ahead of schedule, or behind schedule. The Gantt chart is a graphical format used for the planning, scheduling, and controlling of work, including recording the progress of a project and its stages. [1]
Gantt described a graphical daily balance in a 1903 article. The daily balance has rows for each day and columns for each part or operation. Heavy horizontal lines indicate the starting date and the date that the order should be done. In his 1919 book Organizing for Work, Gantt gave two principles for his charts. The first was to measure activities by the amount of time needed to complete them. The second was that the space on the chart can represent the amount of the activity that should have been done in that time. [1]
Karol Adamiecki invented a similar method in 1896, but he did not publish in a language popular in the West. Gantt developed his version around the years 1910 to 1915, and the solution became attributed to Gantt. [1]
Gantt designed the 'task and bonus' system of wage payment and additional measurement methods for worker efficiency and productivity. He linked the bonus paid to managers to how well they taught their employees to improve performance. [1]
In his 1916 book Work, Wages, and Profits, Gantt discussed scheduling, especially in the job shop environment. He proposed giving the foreman a daily order of work, which is an ordered list of jobs to be done that day. He also warned that the most elegant schedules created by planning offices are useless if they are ignored. [1]
Gantt charts were employed on major infrastructure projects including the Hoover Dam and Interstate highway system. They continue to be an important tool in project management and program management. The chart has a modern variation, Program Evaluation and Review Technique (PERT). [1]
Gantt is listed under Stevens Institute of Technology alumni. The American Society of Mechanical Engineers published his biography in 1934 and awards an annual medal in his honor. [1]
Gantt's task and bonus system has drawn comparisons to the task system used by slave owners. Gantt's father, Virgil, owned more than 60 slaves. Gantt was a vocal critic of slavery. One critic described this as "scientific management replicated slavery’s extractive techniques while jettisoning the institution itself." [1]